Programme Engineering Order date: February 2012 Full Order date: March 2012 Installation commenced: May 2012 Substantial completion: December 2012 (7 months) Commissioning commenced: January 2013 This project ordered in February 2012 involves all of the elements of a flue gas treatment plant and was installed as part of an innovative new build Advanced Thermal […]
Category: Projects – Hot Gas Filtration
Project AR – High Temperature CleanPulse Filter with Offline Cleaning, Online Maintenance and a Spark Detection System
Pr From initial enquiry to completion of installation this project extended over 3 years, although the installation was achieved in 8 weeks to a tight changeover schedule. The requirement was for a replacement filter plant with offline cleaning, online maintenance to remove waste dust from two Aluminium Recycling Furnaces utilising the clients existing sodium bicarbonate […]
Project FFH – Dual CleanPulse Bag Filter with Trend BMS Controls for the NHS
Dual Cle Summary Three coal-fired boilers at Fairfield Hospital in Bury, Manchester provide steam for hospital heating, cleaning and surgical needs. The continuous operation of these boilers is therefore critical. The boilers emitted their waste gases to atmosphere which included some large particles which affected the local area during periods of heavy smoke output. The […]
Project AS – Two CleanPulse Ceramic Filters for Export to Singapore
Note: A signed confidentiality agreement prevents us disclosing further detail of this project. A worldwide household name required 2 gas treatment systems to operate in a pilot plant that is required to be operational for a minimum 8400 hours (360 days) per annum. Most importantly this application involved a usually hot gas inlet temperature of […]
Project PB – Large CleanPulse Bag Filter with Sodium Bicarbonate Silo, Wet Ash De-duster, CEMS and Chimney
Heineken UK – Royal Brewery, Manchester and John Smith’s Brewery, Tadcaster Spent Grain from Royal Brewery Manchester At the Royal Brewery in Manchester, U.K., green beer is not just for St. Patrick’s Day. Soon all the beer produced by the plant will be “green,” thanks to a new energy efficient combined-heat-and-power system (CHP) fuelled by […]
Project BF – CleanPulse bag filters, twin fans, sodium bicarbonate dosing and waste ash silos
This project ordered in early 2011, comprises: Ducting – flanged and bolted, insulated, with temperature and pressure instrumentation Bag filter – 75,000 Am3/hr at 150˚Cwith PTFE on glass bags, offline cleaning capability, online maintenance via inlet valves isolation Integrated access – bag filter CAT ladder and walkway Residue discharge – blow line into ash silo […]
Project AQF – CleanPulse Bag Filter for Tallow Engines
A farm in Northern Ireland processes animal by-products. One of the products of animal rendering is Tallow (fat). This product can now be used as a fuel in a near-to-standard diesel engine making use of some pioneering tweaks and additives under patent. The project included 3 diesel engines, which generate power for the site. The […]
Project TH – Municipal Waste Incineration Bag Filter with Sodium Bicarbonate and Activated Carbon Injection
Summary From initial enquiry to completion of installation this project extended over 20 months. The requirement was for a gas cleaning plant and sorbent injection systems to remove toxic waste gases from a new commercial waste incineration plant. The plant was housed in a new building and comprised a dual feed system of mixed biomass […]
Project JM – High temperature cartridge filter on a precious metals process
Summary Three companies were approached to tender for this smelting pot venting filter project. Filter Designs won the order due to our ability to deliver the right solution at the right price. A CleanPulse 5 series filter is being installed. Supply Highlights Special Pulse Jet Filter Design High Temperature Filter Cartridges Secondary HEPA filter Anti-cake […]