The original enquiry was to come to site and take some volumetric readings and to measure up to replace the lime reactor tower which was part of a waste incineration plant at Hillingdon hospital. The plant had been recently taken over and was being refurbished as the plant was in quite a poor condition. Our […]
Month: October 2021
Project BHC – Cement Mill 2 Ducting
CONSULTANT’S REPORT The previous owners of the plant consulted us back in 2012 to look at replacing the ducting for a cement mill which subsequently didn’t go ahead. After the plant was taken over this project was re-visited but rather than use the existing drawings, the customer wanted a neater design which was easier to […]