Project won for Aluminium plant to transport Lime waste to a silo for tanker offloading. Consultancy works continue for aluminium plants. Designed a huge ceramic filter. Wood waste to hot water project won with complete FGT system. Lean phase conveying system to silo won. Replacement filter for aluminium plant in Coventry installed in a tight space in a short lead time. Ceramic filter for pilot plant at university ordered.
An empty warehouse is always a welcome place to start a project. This is because we have a blank canvas with which to design an ideal layout for a flue gas treatment plant. Once installed, our system cleans the gases from a waste boiler and waste infeed plant and will allow the end user to stop transporting waste around the country and manage it locally, save on transport costs and produce some electricity too.