Back in February 2008 Filter Designs had a contract to supply two identical filter systems for a client in Lancing, Sussex. It was a challenging project dealing with a client who believed they knew best.
They went bust shortly afterwards.
Thankfully they were not the end user and we have maintained a relationship with the end user since. This year we have an order to extend the filter body on line B. This presents its own challenges but will feature in a case study soon.

I was reminded of two life changing events whilst on site this October 2023.
The first is the birth of our daughter, born very prematurely in 2008 at the same time as this project was underway. She has grown up to be a beautiful and exceptionally smart girl.
The second is that image of my late father Roger, pictured here standing in the same filter 15 years ago. Working together for 15 years we had some great times and I miss him, even the terrible jokes. He would be pleased to see us back at this project helping our client achieve new goals.
We mark the two-year anniversary of his passing later this month, rest in peace Dad.
An empty warehouse is always a welcome place to start a project. This is because we have a blank canvas with which to design an ideal layout for a flue gas treatment plant. Once installed, our system cleans the gases from a waste boiler and waste infeed plant and will allow the end user to stop transporting waste around the country and manage it locally, save on transport costs and produce some electricity too.