Phase 2 is underway for an existing client based in Scunthorpe.
This is also their second system from us, having successfully run the first system for several years... with near-zero emissions to atmosphere.
And to top it all, this second project is twice the size and will allow our client's R&D Department to continue developing and testing their intumescent paint products.
The system we've designed contains three core components from our product range:



An empty warehouse is always a welcome place to start a project. This is because we have a blank canvas with which to design an ideal layout for a flue gas treatment plant. Once installed, our system cleans the gases from a waste boiler and waste infeed plant and will allow the end user to stop transporting waste around the country and manage it locally, save on transport costs and produce some electricity too.